Lift and re-lay block paving in Oban: what to expect
In and around Oban, village-style frontages sit alongside newer cul-de-sacs, so the right block often depends on the age of the house.
Frost and heavy rain test paving in Scotland, so a well-drained sub-base and full joints matter as much as the blocks.
In Scotland block paving is often called monoblock; it is the same thing, and the same rules for the base, edging and drainage apply.
Work in Argyll and Bute is by arrangement: we confirm availability and any travel charge before a visit, and many jobs can be priced from photos first.
How much does a lift and re-lay job cost in Oban?
Most lift and re-lay job quotes in Scotland fall within £35–£80 per m² including VAT. 30 m² re-laid would usually be about £1,050–£2,400, with any extras listed separately on your quote.
| Item | Guide price inc VAT |
|---|---|
| Lift and re-lay on a sound base | £35–£80 per m² |
| Small repair (a few blocks or a short trench) | £200–£650 |
| Sunken or rutted patch repaired | £300–£1,200 |
| Lift and re-lay with sub-base rebuilt | £60–£110 per m² |
Guide figures for Scotland, checked 9 November 2026. See all prices or use the guide price tool.
What does a lift and re-lay job involve?
It is also the way to change a layout, add drainage or a recessed cover, or raise or lower a drive, without buying new blocks. A small allowance of new blocks is usually needed for breakages and new cuts.
- Survey of the blocks: thickness, damage and whether they are worth re-using
- New screeded laying course
- Sub-base repaired or rebuilt where needed
- Blocks relaid, new cuts made, edges re-set
- Jointing sand and compaction
How we find the cause
- Trees, roots and past trenches
- What caused the dip or movement: base, laying course, edging or drains
- Replacement blocks or hidden blocks to swap in
- Whether a drain or gully is leaking under the paving
- How much of the area needs lifting to blend the repair
From enquiry to finished paving
Quick details
Your postcode and the job. It takes a minute.
On-site check
Measurements, levels against the damp-proof course, ground and drainage.
Itemised quote
Fixed once the specification is agreed, with no vague extras.
Laid and finished
Compacted, jointed and handed back clean.
How we work
Water planned first
Falls, channels and soakaways are designed before the pattern is chosen.
Honest timescales
We tell you how long the job takes and what can delay it, such as approvals and weather.
Repair before replace
If your drive can be fixed or re-laid, we will say so.
Edges set in concrete
Every edge restraint is bedded and haunched, so the paving cannot creep.
Lift and re-lay in Oban: questions
Can you send someone just to look?
For larger or unclear problems we visit; for small repairs, clear photos with a tape measure in shot are often enough to price it.
How much does a lift and re-lay job cost in Oban?
Our guide is £35–£80 per m² including VAT. Small repairs are often priced from photos.
Why does block paving sink?
Most dips come from a thin or poorly compacted sub-base, too much sand under the blocks, failed edging, or water washing material out from a broken drain.
Can you repair block paving in Oban without replacing it?
Usually, yes. We lift the affected blocks, fix the bed or base, and re-lay the same blocks so the repair matches.
Lift and re-lay near Oban
Nearby towns we cover for lift and re-lay, and lift and re-lay across Argyll and Bute:

