Guide

Block paving or tarmac: which is better for a driveway?

Tarmac is usually cheaper and quick to lay; block paving costs more but looks smarter, comes in many colours and patterns, and can be repaired a block at a time. Both need a properly built base to last.

Last updated 9 November 2026 · Prices include VAT at 20%

Driveway half old cracked tarmac and half new brindle herringbone block paving

Cost

Block paving typically costs £85–£140 per m² including VAT on a new base. Tarmac is usually less per square metre, especially on large areas.

Repairs

A damaged area of block paving can be lifted and relaid with the same blocks. Tarmac patches tend to show, and tarmac can soften in hot weather and crack with age.

Drainage

Standard block paving and tarmac both shed water and need falls and drainage. Permeable versions of both exist.

Can block paving go over tarmac?

Rarely directly. Sound tarmac can sometimes form part of the base, but edges and levels usually mean breaking it out. See replacing an old drive.

More questions

Which lasts longer, block paving or tarmac?

Well-built block paving commonly lasts 20 to 30 years and can be relaid; tarmac lifespan depends heavily on the base and the thickness laid.

Written by the Block Paving Contractors survey team
Reviewed 9 November 2026. Sources include the BS 7533 series, Interpave and manufacturer laying guidance, GOV.UK, gov.wales, gov.scot and nidirect planning guidance, and the Consumer Contracts Regulations 2013.
Add Block Paving Contractors as a preferred source on Google

Next step

Get a guide price in two minutes

Answer four quick questions for an instant guide price, then book a free survey to fix it in writing. Repairs and cleaning can often be priced from photos.

Hands laying charcoal paving blocks in herringbone on a sand bed
CallGet a quote