Somerset · Patios

Block paved patios in Bath

If you are in Bath (BA1, BA2, BS31) and want a block paved patio, we will measure up, check the levels against the house and give you a written, itemised price.

  • Postcodes BA1, BA2, BS31
  • £80–£140 per m² inc VAT
  • Free survey for new paving
Buff and charcoal block paved patio in basketweave with a garden table and planters

What to know before a block paved patio in Bath

Bath has everything from small terrace yards to big gardens on newer estates, so the survey sets the layout, the levels and the dig.

The South West is wetter than the east of England, so falls and drainage are planned before the pattern is chosen.

How much does a block paved patio cost in Bath?

Guide price in Bath£80–£140 per m²Including VAT at 20%

In the South West, a block paved patio usually costs £80–£140 per m² including VAT. For a 20 m² patio, that is roughly £1,850–£3,200. Your exact price depends on what the survey or your photos show, and is fixed in writing before anything is booked.

ItemGuide price inc VAT
Block paved patio (concrete block)£80–£140 per m²
Breaking out an old surface£10–£40 per m²
Edging or kerb, bedded and haunched£20–£50 per metre
Step with block or brick riser and paved tread£180–£350 per step
Typical channel drain run£350–£1,000

Guide figures for the South West, checked 9 November 2026. See all prices or use the guide price tool.

What you get with our patios service

Block suits patios that join a block drive or path, small or awkward spaces where large slabs would need too many cuts, and gardens where you want a pattern such as basketweave or a circle feature. We lay patios to fall away from the house and below the damp-proof course, with edging that stops the blocks creeping into the lawn.

  • Jointing sand and compaction
  • Layout marked out with you, including steps and doors
  • Optional sealer
  • Dig-out and compacted sub-base (around 100 mm for foot traffic)
  • Falls away from the house and doors

What the survey covers

  • Trees and roots near the paving
  • Levels against the damp-proof course and door thresholds
  • Access for a mini-digger and how waste leaves the garden
  • Block range, colour, pattern and border to suit the house
  • Where rain will go: falls away from the house, onto lawn or borders, or into a channel

Do you need permission for a block paved patio in Bath?

A patio or path behind the house does not usually need planning permission. Raised patios, listed buildings and flats can be different, so we check on the survey.

Paving in front of the house follows the front-garden rules: in England, a front drive over 5 m² needs planning permission unless it is permeable or drains to a lawn or border within your boundary.

From enquiry to finished paving

  1. Tell us about the job

    Use the form, the quote tool, WhatsApp or a call.

  2. We take a look

    A survey visit, or photos for smaller repair and cleaning jobs.

  3. Price in writing

    Every line itemised, including the dig, edging and drainage.

  4. Booked and built

    Agreed start date, then the work, the final clean-down and the joint top-up.

What you can expect from us

Honest timescales

We tell you how long the job takes and what can delay it, such as approvals and weather.

The dig and sub-base in writing

Your quote states the depth of dig, the sub-base thickness and how it is compacted.

Edges set in concrete

Every edge restraint is bedded and haunched, so the paving cannot creep.

Water planned first

Falls, channels and soakaways are designed before the pattern is chosen.

Patios in Bath: questions

How long does a block paved patio take?

Most patios and paths take two to five working days, depending on the size, any steps and the dig. Your quote gives the expected duration.

Do you cover Frome, Nailsea and Portishead?

Yes. We cover Bath and the places around it, including Frome, Nailsea and Portishead, and the rest of Somerset.

What happens to my old patio or lawn?

Old slabs, concrete or turf are dug out and taken away, listed as its own line on your quote.

Can the paving be level with the back door?

Paving normally sits at least 150 mm below the damp-proof course. A level step-out needs a drainage channel against the house and careful detailing, which we agree on the survey.

Patios near Bath

Nearby towns we cover for patios, and patios across Somerset:

Other block paving services in Bath

Or see all block paving services in Bath.

Next step

Get a guide price in two minutes

Want a number before a visit? Try the guide price tool, then book a survey to fix it.

Hands laying charcoal paving blocks in herringbone on a sand bed
CallGet a quote