Greater London · Lift and re-lay

Lift and re-lay block paving in Barking

Before you replace a block drive in Barking, ask whether it can be repaired: re-levelling and re-laying often cost far less than new paving.

  • Postcodes IG11, E20, E6
  • £40–£95 per m² inc VAT
  • Free survey for new paving
Cleaned blocks stacked beside a screeded sand bed during a lift and re-lay

Lift and re-lay block paving in Barking: the local picture

Barking has a big mix of housing, from older terraces near the centre to newer estates further out, so no two drives here start from the same ground.

Many London streets have controlled parking and narrow frontages, so we measure the car space and the crossover before anything else.

How much does a lift and re-lay job cost in Barking?

Guide price in Barking£40–£95 per m²Including VAT at 20%

For Barking, our guide is £40–£95 per m² including VAT, so 30 m² re-laid is likely to be £1,250–£2,900. Smaller jobs cost more per square metre because set-up and waste costs do not shrink with the area.

ItemGuide price inc VAT
Lift and re-lay on a sound base£40–£95 per m²
Small repair (a few blocks or a short trench)£240–£780
Sunken or rutted patch repaired£360–£1,450
Lift and re-lay with sub-base rebuilt£70–£130 per m²

Guide figures for London, checked 9 November 2026. See all prices or use the guide price tool.

What is included?

It is also the way to change a layout, add drainage or a recessed cover, or raise or lower a drive, without buying new blocks. A small allowance of new blocks is usually needed for breakages and new cuts.

  • New screeded laying course
  • Lifting, cleaning and stacking
  • Jointing sand and compaction
  • Blocks relaid, new cuts made, edges re-set
  • Sub-base repaired or rebuilt where needed

What we look at first in Barking

  • Whether a drain or gully is leaking under the paving
  • Condition and thickness of your existing blocks
  • What caused the dip or movement: base, laying course, edging or drains
  • Trees, roots and past trenches
  • Whether the edging has moved or was never set in concrete

What happens next

  1. Tell us about the job

    Use the form, the quote tool, WhatsApp or a call.

  2. We take a look

    A survey visit, or photos for smaller repair and cleaning jobs.

  3. Price in writing

    Every line itemised, including the dig, edging and drainage.

  4. Booked and built

    Agreed start date, then the work, the final clean-down and the joint top-up.

What you can expect from us

Edges set in concrete

Every edge restraint is bedded and haunched, so the paving cannot creep.

Clean finish

The site is swept, the joints are filled and you are shown how to look after the paving.

The dig and sub-base in writing

Your quote states the depth of dig, the sub-base thickness and how it is compacted.

Honest timescales

We tell you how long the job takes and what can delay it, such as approvals and weather.

Lift and re-lay in Barking: questions

Why does block paving sink?

Most dips come from a thin or poorly compacted sub-base, too much sand under the blocks, failed edging, or water washing material out from a broken drain.

How much does a lift and re-lay job cost in Barking?

Our guide is £40–£95 per m² including VAT. Small repairs are often priced from photos.

Can you send someone just to look?

For larger or unclear problems we visit; for small repairs, clear photos with a tape measure in shot are often enough to price it.

Do you cover Ilford, Becontree and Thamesmead?

Yes. We cover Barking and the places around it, including Ilford, Becontree and Thamesmead, and the rest of Greater London.

Lift and re-lay near Barking

Nearby towns we cover for lift and re-lay, and lift and re-lay across Greater London:

Other block paving services in Barking

Or see all block paving services in Barking.

Next step

Get a guide price in two minutes

Call, WhatsApp or use the form, and we will come back to you to arrange a visit or a price from photos.

Hands laying charcoal paving blocks in herringbone on a sand bed
CallGet a quote