Planning a lift and re-lay job in Clydebank
In Clydebank, many front gardens have already been paved once, so new paving often starts with breaking out the old surface.
In Scotland, front paving must be porous or drain within the property whatever its size, so drainage is part of every design.
In Scotland block paving is often called monoblock; it is the same thing, and the same rules for the base, edging and drainage apply.
How much does a lift and re-lay job cost in Clydebank?
Guide price in Clydebank: £35–£80 per m² including VAT, which puts 30 m² re-laid at about £1,050–£2,400. These are Scotland guide figures; the survey confirms the real price before you commit.
| Item | Guide price inc VAT |
|---|---|
| Lift and re-lay on a sound base | £35–£80 per m² |
| Small repair (a few blocks or a short trench) | £200–£650 |
| Sunken or rutted patch repaired | £300–£1,200 |
| Lift and re-lay with sub-base rebuilt | £60–£110 per m² |
Guide figures for Scotland, checked 9 November 2026. See all prices or use the guide price tool.
What does a lift and re-lay job involve?
Lift and re-lay means taking up an existing block paved area, cleaning and stacking the blocks, correcting the bed and the sub-base, and laying the same blocks back down. When the blocks are still sound, it fixes widespread sinking, rocking and uneven joints for less than a new drive, because the blocks themselves are re-used.
- Sub-base repaired or rebuilt where needed
- Jointing sand and compaction
- New screeded laying course
- Survey of the blocks: thickness, damage and whether they are worth re-using
- Blocks relaid, new cuts made, edges re-set
How we find the cause
- How much of the area needs lifting to blend the repair
- Whether a drain or gully is leaking under the paving
- What caused the dip or movement: base, laying course, edging or drains
- Replacement blocks or hidden blocks to swap in
- Trees, roots and past trenches
How it works
Quick details
Your postcode and the job. It takes a minute.
On-site check
Measurements, levels against the damp-proof course, ground and drainage.
Itemised quote
Fixed once the specification is agreed, with no vague extras.
Laid and finished
Compacted, jointed and handed back clean.
How we work
Honest timescales
We tell you how long the job takes and what can delay it, such as approvals and weather.
One point of contact
You deal with one team from survey to sign-off, with work carried out by paving teams working under S&K.
Itemised quotes
Break-out, waste, edging, drainage and covers are separate lines you can see.
Edges set in concrete
Every edge restraint is bedded and haunched, so the paving cannot creep.
Lift and re-lay in Clydebank: questions
Can you repair block paving in Clydebank without replacing it?
Usually, yes. We lift the affected blocks, fix the bed or base, and re-lay the same blocks so the repair matches.
Can you send someone just to look?
For larger or unclear problems we visit; for small repairs, clear photos with a tape measure in shot are often enough to price it.
Do you cover Bearsden, Milngavie and Dumbarton?
Yes. We cover Clydebank and the places around it, including Bearsden, Milngavie and Dumbarton, and the rest of Glasgow and Dunbartonshire.
How much does a lift and re-lay job cost in Clydebank?
Our guide is £35–£80 per m² including VAT. Small repairs are often priced from photos.
Lift and re-lay near Clydebank
Nearby towns we cover for lift and re-lay, and lift and re-lay across Glasgow and Dunbartonshire:
- Lift and re-lay in Bearsden
- Lift and re-lay in Milngavie
- Lift and re-lay in Dumbarton
- Lift and re-lay in Bishopbriggs
- Lift and re-lay in Vale of Leven
- Lift and re-lay in Rutherglen

