Planning a lift and re-lay job in Brent
Brent has everything from short terrace frontages to wide drives on newer estates, so the survey sets the layout and the dig.
Many London streets have controlled parking and narrow frontages, so we measure the car space and the crossover before anything else.
How much does a lift and re-lay job cost in Brent?
For Brent, our guide is £40–£95 per m² including VAT, so 30 m² re-laid is likely to be £1,250–£2,900. Smaller jobs cost more per square metre because set-up and waste costs do not shrink with the area.
| Item | Guide price inc VAT |
|---|---|
| Lift and re-lay on a sound base | £40–£95 per m² |
| Small repair (a few blocks or a short trench) | £240–£780 |
| Sunken or rutted patch repaired | £360–£1,450 |
| Lift and re-lay with sub-base rebuilt | £70–£130 per m² |
Guide figures for London, checked 9 November 2026. See all prices or use the guide price tool.
What does a lift and re-lay job involve?
It is also the way to change a layout, add drainage or a recessed cover, or raise or lower a drive, without buying new blocks. A small allowance of new blocks is usually needed for breakages and new cuts.
- Lifting, cleaning and stacking
- Jointing sand and compaction
- Survey of the blocks: thickness, damage and whether they are worth re-using
- Sub-base repaired or rebuilt where needed
- Blocks relaid, new cuts made, edges re-set
What we look at first in Brent
- Falls, so water does not collect again
- Whether the edging has moved or was never set in concrete
- What caused the dip or movement: base, laying course, edging or drains
- How much of the area needs lifting to blend the repair
- Trees, roots and past trenches
From enquiry to finished paving
Tell us about the job
Use the form, the quote tool, WhatsApp or a call.
We take a look
A survey visit, or photos for smaller repair and cleaning jobs.
Price in writing
Every line itemised, including the dig, edging and drainage.
Booked and built
Agreed start date, then the work, the final clean-down and the joint top-up.
Why choose Block Paving Contractors
One point of contact
You deal with one team from survey to sign-off, with work carried out by paving teams working under S&K.
The dig and sub-base in writing
Your quote states the depth of dig, the sub-base thickness and how it is compacted.
Edges set in concrete
Every edge restraint is bedded and haunched, so the paving cannot creep.
Water planned first
Falls, channels and soakaways are designed before the pattern is chosen.
Lift and re-lay in Brent: questions
Can you send someone just to look?
For larger or unclear problems we visit; for small repairs, clear photos with a tape measure in shot are often enough to price it.
Why does block paving sink?
Most dips come from a thin or poorly compacted sub-base, too much sand under the blocks, failed edging, or water washing material out from a broken drain.
Do you cover Harrow, Greenford and Acton?
Yes. We cover Brent and the places around it, including Harrow, Greenford and Acton, and the rest of Greater London.
How much does a lift and re-lay job cost in Brent?
Our guide is £40–£95 per m² including VAT. Small repairs are often priced from photos.
Lift and re-lay near Brent
Nearby towns we cover for lift and re-lay, and lift and re-lay across Greater London:
- Lift and re-lay in Harrow
- Lift and re-lay in Greenford
- Lift and re-lay in Acton
- Lift and re-lay in Willesden
- Lift and re-lay in Cricklewood
- Lift and re-lay in Southall

