How much does a front garden driveway cost in Moray?
For Moray, our guide is £85–£140 per m² including VAT, so a 50 m² double drive is likely to be £4,250–£7,000. Smaller jobs cost more per square metre because set-up and waste costs do not shrink with the area.
| Item | Guide price inc VAT |
|---|---|
| Concrete block driveway, new sub-base | £85–£140 per m² |
| Breaking out an old surface | £10–£40 per m² |
| Edging or kerb, bedded and haunched | £20–£50 per metre |
| Typical channel drain run | £350–£1,000 |
| Dropped kerb (vehicle crossover) construction | £1,000–£3,000 |
Guide figures for Scotland, checked 9 November 2026.
Towns we cover in Moray
Choose a town for local prices and details for front garden drives:
What is included?
We check those three things before anything else. A typical small front garden needs the boundary wall or hedge opened, the ground dug out, a sub-base built and the surface laid so rain drains into a planted strip or through permeable blocks. Keeping a narrow planted border is often what makes the drainage work.
In Scotland, front paving must be porous or drain within the property whatever its size, so drainage is part of every design.
- Wall, hedge or fence opening and making good the ends
- Advice on the dropped kerb application before work starts
- Optional bin store area, planting strip and low edging
- Space check: car length, door swing and the gap to the pavement
- Dig-out, sub-base and edging
What the survey covers
- Access for a mini-digger, skip or grab lorry
- Whether front-garden planning rules apply
- Block range, thickness, colour and pattern to suit the house
- Trees and roots near the drive
- Where rain will go: falls, lawn, border, channel or soakaway
Rules for front drives in Moray
In Scotland, a hard surface between the house and the road is permitted development only if it is porous or drains to a permeable area within the property. There is no 5 m² threshold: the rule applies whatever the size.
Hard surfaces are not permitted development in a conservation area or within the grounds of a listed building, so planning permission is needed there.
A dropped kerb needs consent from your council as roads authority under section 56 of the Roads (Scotland) Act 1984, and planning permission may also be needed depending on the road.
General guidance, not legal advice. Your survey confirms what applies to your home. See the planning guide.
How it works
Tell us about the job
Use the form, the quote tool, WhatsApp or a call.
We take a look
A survey visit, or photos for smaller repair and cleaning jobs.
Price in writing
Every line itemised, including the dig, edging and drainage.
Booked and built
Agreed start date, then the work, the final clean-down and the joint top-up.
Front garden drives in Moray: questions
How long does a front garden driveway take to build?
Most homes take between three and seven working days, depending on size, the dig and the drainage. Your quote gives the expected duration.
Is the survey in Moray free?
In Moray we cover jobs by arrangement. We will confirm before any visit whether a charge applies, and many jobs can be priced from photos first.
Do I need planning permission for a front garden driveway in Moray?
In Scotland, front paving must be porous or drain within your boundary at any size, and permitted development does not apply in conservation areas. Ask us on the survey if you are unsure.
What happens to my old drive?
It is broken out and taken away by skip or grab lorry, listed as its own line on your quote.

