How much does a front garden driveway cost in County Tyrone?
Expect front garden driveways in County Tyrone to come in at around £80–£135 per m², including VAT at 20%. As an example, a 50 m² double drive usually comes to between £4,050 and £6,650.
| Item | Guide price inc VAT |
|---|---|
| Concrete block driveway, new sub-base | £80–£135 per m² |
| Breaking out an old surface | £9.50–£40 per m² |
| Edging or kerb, bedded and haunched | £19–£50 per metre |
| Typical channel drain run | £330–£950 |
| Dropped kerb (vehicle crossover) construction | £950–£2,850 |
Guide figures for Northern Ireland, checked 9 November 2026.
Towns we cover in County Tyrone
Choose a town for local prices and details for front garden drives:
What is included?
A front garden conversion turns a lawn or small front garden into off-street parking. For terraces and semis without a drive, it is often the single most useful change to the house, but it only works if a car fits, the water has somewhere to go and the council will drop the kerb.
Wet winters in Northern Ireland make falls, edge restraints and full joints especially important.
- Optional bin store area, planting strip and low edging
- Wall, hedge or fence opening and making good the ends
- Dig-out, sub-base and edging
- Permeable blocks or falls to a planted border
- Advice on the dropped kerb application before work starts
What the survey covers
- Edges against lawns, beds, walls and neighbours
- Existing manhole and inspection covers, and whether to recess them
- Whether front-garden planning rules apply
- Levels against the damp-proof course (the finished paving must sit at least 150 mm below it)
- The kerb: is it already dropped, and is it wide enough?
Rules for front drives in County Tyrone
In Northern Ireland, a hard surface between the front of the house and the road that covers or replaces more than 5 m² must be porous or permeable, or drain to a permeable area within the property, to be permitted development.
Hard surfaces within the grounds of a listed building need listed building consent. Planning is handled by your district council, so check with its planning office if you are unsure.
Dropped kerbs in Northern Ireland are approved by DfI Roads (the Department for Infrastructure), not the council; check planning separately with the council.
General guidance, not legal advice. Your survey confirms what applies to your home. See the planning guide.
How it works
Tell us about the job
Use the form, the quote tool, WhatsApp or a call.
We take a look
A survey visit, or photos for smaller repair and cleaning jobs.
Price in writing
Every line itemised, including the dig, edging and drainage.
Booked and built
Agreed start date, then the work, the final clean-down and the joint top-up.
Front garden drives in County Tyrone: questions
How long does a front garden driveway take to build?
Most homes take between three and seven working days, depending on size, the dig and the drainage. Your quote gives the expected duration.
Do you cover Omagh, Strabane and Dungannon?
Yes. We cover all of County Tyrone, including Omagh, Strabane and Dungannon.
Is the survey in County Tyrone free?
Yes, for new paving here: the survey and written quote are free with no obligation. Repairs and cleaning are usually priced from photos, or from a short visit where needed.
What happens to my old drive?
It is broken out and taken away by skip or grab lorry, listed as its own line on your quote.

