What to know before a block paved patio in Truro
Truro is a smaller town, and many homes have more garden to work with, which leaves room for borders, steps and planting around the paving.
Sloping plots are common in the South West, which affects edging, steps and where the water runs.
How much does a block paved patio cost in Truro?
Guide price in Truro: £80–£140 per m² including VAT, which puts a 20 m² patio at about £1,850–£3,200. These are South West guide figures; the survey confirms the real price before you commit.
| Item | Guide price inc VAT |
|---|---|
| Block paved patio (concrete block) | £80–£140 per m² |
| Breaking out an old surface | £10–£40 per m² |
| Edging or kerb, bedded and haunched | £20–£50 per metre |
| Step with block or brick riser and paved tread | £180–£350 per step |
| Typical channel drain run | £350–£1,000 |
Guide figures for the South West, checked 9 November 2026. See all prices or use the guide price tool.
What is included?
Block suits patios that join a block drive or path, small or awkward spaces where large slabs would need too many cuts, and gardens where you want a pattern such as basketweave or a circle feature. We lay patios to fall away from the house and below the damp-proof course, with edging that stops the blocks creeping into the lawn.
- Layout marked out with you, including steps and doors
- Jointing sand and compaction
- Falls away from the house and doors
- Blocks in your pattern, edges and cuts
- Dig-out and compacted sub-base (around 100 mm for foot traffic)
What we check on a Truro survey
- Steps, walls and changes of level
- Access for a mini-digger and how waste leaves the garden
- Levels against the damp-proof course and door thresholds
- Where rain will go: falls away from the house, onto lawn or borders, or into a channel
- Edges against lawns, beds, fences and walls
Do you need permission for a block paved patio in Truro?
A patio or path behind the house does not usually need planning permission. Raised patios, listed buildings and flats can be different, so we check on the survey.
Paving in front of the house follows the front-garden rules: in England, a front drive over 5 m² needs planning permission unless it is permeable or drains to a lawn or border within your boundary.
What happens next
Quick details
Your postcode and the job. It takes a minute.
On-site check
Measurements, levels against the damp-proof course, ground and drainage.
Itemised quote
Fixed once the specification is agreed, with no vague extras.
Laid and finished
Compacted, jointed and handed back clean.
Why choose Block Paving Contractors
The dig and sub-base in writing
Your quote states the depth of dig, the sub-base thickness and how it is compacted.
Water planned first
Falls, channels and soakaways are designed before the pattern is chosen.
One point of contact
You deal with one team from survey to sign-off, with work carried out by paving teams working under S&K.
Edges set in concrete
Every edge restraint is bedded and haunched, so the paving cannot creep.
Patios in Truro: questions
Do you cover Falmouth, Redruth and Newquay?
Yes. We cover Truro and the places around it, including Falmouth, Redruth and Newquay, and the rest of Cornwall.
How long does a block paved patio take?
Most patios and paths take two to five working days, depending on the size, any steps and the dig. Your quote gives the expected duration.
What happens to my old patio or lawn?
Old slabs, concrete or turf are dug out and taken away, listed as its own line on your quote.
Can the paving be level with the back door?
Paving normally sits at least 150 mm below the damp-proof course. A level step-out needs a drainage channel against the house and careful detailing, which we agree on the survey.
Patios near Truro
Nearby towns we cover for patios, and patios across Cornwall:

